Bunnings New Lynn - Large Commercial Warehouse

The main requirements for this project was the volume based through put of fabricated steel, due to the volume of square meters of steel required in a short time spans. 

Once the fabricated steel had been delivered to us, we had four day to turn around 1500m2 of a 2.5 Blast, and a 2 coat paint system.  Our front factory Plant A is ideally suited for this type of work, utilising its 27 1/2m long blast room with square being able to be fed through the back of the blast room for blasting and out the front of the blast room into our factory for coatings.  The setup of Plant A enables very efficient transfer of steel through the different stages enabling  us to turn over vast quantities of fabricated steel in a short period of time.