Otahuhu Rec Centre - Indoor Heated Pool Environment

For this project there was a very stringent coating specification and QA requirement due the steel being exposed to a highly corrosive environment due to a mixture of warm moist air, and chlorides.

The structure was made from mostly  fabricated 300mm diameter pipe section, so provided a number of challenges for setting up for painting, so that minimum damage was done in turning the steel sections for painting on both sides.

This job was complete in our Plant B (our back factory) as this Plant specialises in high end paint specifications and has plenty of room for spreading out difficult fabricated steel sections.