AIAL Fuel Lines

Metspray was engaged by McConnell Dowell to provide both the external and internal surface preparation and coating system for the Auckland International Airport Fuel Network Compliance Stage 4.

Project Duration

Area Coated

The work scope included both in-shop and on site application, where considerations around confined space had to be addressed. Inspections were carried out in line with our Inspection Test Plan developed by our expert in-house NACE Coating Inspectors, providing assurance of full compliance to both McConnell Dowell and Auckland International Airport.