AIAL Fuel Lines

Metspray was engaged by McConnell Dowell to provide both the external and internal surface preparation and coating system for the AIAL Fuel Network Compliance Stage 4.

Project Duration

Area Coated

The work scope included both in-shop application and on site where considerations around confined space had to be addressed. Inspections were carried out as per our ITP, developed by our inhouse NACE Coating Inspectors, giving the assurance of compliance to both McConnell Dowell and AIAL.