Metspray was engaged by McConnell Dowell to provide both the external and internal surface preparation and coating system for the Auckland International Airport Fuel Network Compliance Stage 4.
Metspray was engaged by the main contractor to address quality issues that had arisen with the protective coatings to the structural steel by the previous coatings applicator at the Alexandra Park Apartments build.
Metspray collaborated with SteelPipe Limited to apply the corrosion protection system to both the internal and external surfaces of the mainline pipe crossing over the Tāmaki River at Panmure.
Metspray worked closely with Amediate Engineering to solve the logistical, processing, and handling challenges created by the size of the individual pieces that now make up the sign gantries spanning the Southwestern Motorway connection at Auckland Airport.
Metspray was approached by Atlantic Engineering when issues arose with their incumbent supplier, due to the size and weight of this 27m long, 4m wide, 3m high bridge section.
Since the beginning of 2021, our site team has been providing a custom, fit-for-purpose solution to reinstate all coatings to the structural steel in the NZICC building.
Metspray partnered with Enterprise Steel to apply the intumescent coating system to the structural steel throughout this state-of-the art storage facility.
The Church of Jesus Christ of Latter-day Saints Auckland
Metspray partnered with Global Engineering as their coatings applicator to provide an end-to-end solution to Westland Construction for the protective and intumescent coating systems required for the build of this notable Auckland Temple.