top of page

Auckland Airport Sign Gantries

Metspray worked closely with Amediate Engineering to solve the logistical, processing, and handling issues created by the size of the individual pieces making up the sign gantries spanning the Southwestern Motorway connection at Auckland Airport.

Project Duration

Area Coated

Each gantry section was 18-24m long, 3.5m high, and 2.5m deep, the largest sections weighing more than 5 tonnes. Navigating these large sections through our blast room, into our thermal metal spray booth, and within our open factory coating environment proved challenging with our 5 tonne (load rated) factory cranes. To address this, a combination of gantry cranes and fork hoists were used in the moving and handling process. Metspray achieved a superb commercial finish with only minor handling damage that was touched up onsite, delivering an outstanding result.

I'm a 

I'm a paragraph. Click 

Project Gallery

bottom of page